The Salem Nuclear Power Plant is a two-unit pressurized water reactor nuclear power plant located in Lower Alloways Creek Township, in Salem County, New Jersey, United States. It is owned by PSEG Nuclear LLC and Constellation Energy.

Salem Nuclear Power Plant

United States

Operational

September 25, 1968 (1968-09-25)

Unit 1: June 30, 1977
Unit 2: October 13, 1981

$4.283 billion (2007 USD)[1]

PWR

2 × 3459 MWth

88.55% (2017)
70.50% (lifetime)

19,062 GWh (2021)

In 2019, New Jersey began providing the state's nuclear plants Zero-Emission Certificates worth $300 million a year to keep them in service. The subsidy was ended in 2024, effective June 1, 2025, as the Inflation Reduction Act provides alternative tax credits to support clean energy.[2]

Reactors[edit]

The reactors, both PWRs, were built by Westinghouse, and began commercial operation in 1977 (Unit 1) and 1981 (Unit 2). The two-unit plant has a capacity of 2,275 MWe. In 2009, PSEG applied for 20-year license renewals for both units, which were approved by the NRC in 2011.[4][5] Unit 1 is now licensed to operate until August 13, 2036 and Unit 2 is licensed to operate until April 18, 2040.

Camden

Dover

The Nuclear Regulatory Commission defines two emergency planning zones around nuclear power plants: a plume exposure pathway zone with a radius of 10 miles (16 km), concerned primarily with exposure to, and inhalation of, airborne radioactive contamination, and an ingestion pathway zone of about 50 miles (80 km), concerned primarily with ingestion of food and liquid contaminated by radioactivity.[7]


The 2010 U.S. population within 10 miles (16 km) of Salem was 52,091, an increase of 54.1 percent in a decade, according to an analysis of U.S. Census data for msnbc.com. The 2010 U.S. population within 50 miles (80 km) was 5,482,329, an increase of 7.6 percent since 2000.


Cities within 50 miles:

Safety issues[edit]

The New York Times has reported that in the 1990s the Salem reactors were shut down for two years because of maintenance problems.[9] Consultants found several difficulties, including a leaky generator, unreliable controls on a reactor, and workers who feared that reporting problems would lead to retaliation. In 2004, the Nuclear Regulatory Commission took on additional oversight of the Salem plants and increased the monitoring of them.[9]


An extensive investigation by the Nuclear Regulatory Commission, and the subsequent review by hired consultants have found many minor problems, such as lack of routine maintenance and low morale among personnel, but declared the plant safe.[10]


On August 22, 2013, the Salem nuclear plant was shut down after a leak of slightly radioactive water. The spill was confined to the plant's containment building, and regulators have said there is no risk to the public.[11] The plant restarted on August 24, after having been shut down for less than 48 hours.[12]


In May 2014 a scheduled refueling outage of Salem 2 was extended after broken bolts from a cooling pump were found in the reactor vessel. Westinghouse dispatched a team to inspect the pumps.[13] The inspection revealed bolts in the bottom of the cooling pumps as well as the bottom of the reactor vessel. Unit 2 was returned to service on July 11, 2014.[14]