28th Street station (IRT Lexington Avenue Line)
The 28th Street station is a local station on the IRT Lexington Avenue Line of the New York City Subway. Located under Park Avenue South at 28th Street in the Rose Hill neighborhood of Manhattan, it is served by 6 trains at all times, <6> trains during weekdays in the peak direction, and 4 trains during late night hours.
28 Street
East 28th Street & Park Avenue South
New York, NY
Underground
4
October 27, 1904[2]
July 16, 2018
(reconstruction)January 14, 2019
Partially ADA-accessible (Elevator is present only in the southbound direction)
No
2,717,163[3] 26.8%
127 out of 423[3]
New York City Subway System MPS
March 30, 2005
The 28th Street station was constructed for the Interborough Rapid Transit Company (IRT) as part of the city's first subway line, which was approved in 1900. Construction of the line segment that includes the 28th Street station started on September 12 of the same year. The station opened on October 27, 1904, as one of the original 28 stations of the New York City Subway. The station's platforms were lengthened in the late 1940s.
The 28th Street station contains two side platforms and four tracks; express trains use the inner two tracks to bypass the station. The station was built with tile and mosaic decorations, which are continued along the platform extensions. The platforms contain exits to 28th Street and Park Avenue, as well as to the New York Life Building. The platforms are not connected to each other within fare control. The station is listed on the National Register of Historic Places.
History[edit]
Construction and opening[edit]
Planning for a subway line in New York City dates to 1864.[5]: 21 However, development of what would become the city's first subway line did not start until 1894, when the New York State Legislature passed the Rapid Transit Act.[5]: 139–140 The subway plans were drawn up by a team of engineers led by William Barclay Parsons, the Rapid Transit Commission's chief engineer. It called for a subway line from New York City Hall in lower Manhattan to the Upper West Side, where two branches would lead north into the Bronx.[6]: 3 A plan was formally adopted in 1897,[5]: 148 and all legal conflicts concerning the route alignment were resolved near the end of 1899.[5]: 161 The Rapid Transit Construction Company, organized by John B. McDonald and funded by August Belmont Jr., signed the initial Contract 1 with the Rapid Transit Commission in February 1900,[7] in which it would construct the subway and maintain a 50-year operating lease from the opening of the line.[5]: 165 In 1901, the firm of Heins & LaFarge was hired to design the underground stations.[6]: 4 Belmont incorporated the Interborough Rapid Transit Company (IRT) in April 1902 to operate the subway.[5]: 182
The 28th Street station was constructed as part of the route segment from Great Jones Street to 41st Street. Construction on this section of the line began on September 12, 1900. The section from Great Jones Street to a point 100 feet (30 m) north of 33rd Street was awarded to Holbrook, Cabot & Daly Contracting Company, while the remaining section to 41st Street was done by Ira A. Shaker.[7] By late 1903, the subway was nearly complete, but the IRT Powerhouse and the system's electrical substations were still under construction, delaying the system's opening.[5]: 186 [8] That December, workers installed the station's eight entrance and exit kiosks.[9] The 28th Street station opened on October 27, 1904, as one of the original 28 stations of the New York City Subway from City Hall to 145th Street on the Broadway–Seventh Avenue Line.[2][5]: 186