IRT Lexington Avenue Line
The IRT Lexington Avenue Line (also known as the IRT East Side Line and the IRT Lexington–Fourth Avenue Line) is one of the lines of the A Division of the New York City Subway, stretching from Lower Manhattan north to 125th Street in East Harlem. The line is served by the 4, 5, 6, and <6> trains.
"Lexington Avenue Subway" redirects here. For the now-demolished elevated line in Brooklyn, see BMT Lexington Avenue Line. For other uses of the term "Lexington Avenue", see Lexington Avenue (disambiguation).IRT Lexington Avenue Line
Operational
23 in use (4 abandoned)
497,727 [1]
1904–1918
8.3 mi (13.4 km)
2–4
Underground
1,435 mm (4 ft 8+1⁄2 in)
The line was constructed in two main portions by the Interborough Rapid Transit Company (IRT), a private operator. The first portion, from City Hall north to 42nd Street, was opened between 1904 and 1908, and is part of the first subway line in the city. The original subway turned west across 42nd Street at the Grand Central station, then went north at Broadway, serving the present-day IRT Broadway–Seventh Avenue Line. The second portion of the line, north of 42nd Street, was constructed as part of the Dual Contracts, which were signed between the IRT; the Brooklyn Rapid Transit Company, via a subsidiary; and the City of New York.
For decades, the Lexington Avenue Line was the only line in Manhattan that directly served the Upper East Side and East Midtown; this four-track line is the most used rapid transit line in the United States. Its average of 1.3 million daily riders is more than the total riderships of the transit systems of Chicago (772,900 weekday passengers), Boston (569,200 weekday passengers), and San Francisco (452,600 weekday passengers). The line spurred the construction of the parallel Second Avenue Subway, which opened in 2017, to relieve congestion on the Lexington Avenue line.[2]
Four stations along this line have been abandoned. When platforms were lengthened to fit ten cars, it was deemed most beneficial to close these stations and open new entrances for adjacent stations. The 18th Street station was abandoned because of the proximity to both 14th Street–Union Square and 23rd Street.[3] In addition, the City Hall and Worth Street stations were both very close to the Brooklyn Bridge–City Hall station's Brooklyn Bridge and Duane Street exits, respectively, so both were abandoned.[4][5] Finally, South Ferry is within walking distance of Bowling Green, and is right next to the corresponding station on the Broadway–Seventh Avenue line.[6]
Overcrowding[edit]
The Second Avenue Elevated fully closed on June 13, 1942.[46] Because of the elevated line's closure, as well as a corresponding increase in the East Side population, crowding on the Lexington Avenue Line increased.[47]: 1–2 [48] The Manhattan section of the Third Avenue Elevated, the only other elevated line in the area, closed on May 13, 1955,[49] and was demolished in 1956.[46]
Contrary to what many East Side residents thought, the demolition of the elevateds did not help the travel situation, as the Lexington Avenue Line was now the only subway transportation option on the East Side.[50] As the elevated lines were torn down, hundreds of high-rise apartment buildings were built on the East Side, and the business districts along the line grew, resulting in overcrowding along the line.[51]: 377 Both of these elevated lines were supposed to be replaced by a subway line under Second Avenue. However, it was not completed due to a lack of funds. With the city's economic and budgetary recovery in the 1990s, there was a revival of efforts to complete construction of the Second Avenue Subway.[52] Once fully built, the line will run from 125th Street and Lexington Avenue to Hanover Square in the Financial District.[53]: 22 Construction started in 2007, and on January 1, 2017, the first phase, between Lexington Avenue–63rd Street and 96th Street opened. Within a few months of the line's opening, crowding on the Lexington Avenue Line stations on the Upper East Side was somewhat reduced.[54] East Side Access, completed in 2023, brought Long Island Rail Road service into Grand Central. With more people coming onto the East Side, increased crowding is expected on the Lexington Avenue Line, underscoring the need for the Second Avenue Subway.[55]: 7
Crowding on the line is so bad that riders are routinely stranded on the platform, having to wait for multiple trains to pass before being able to board.[56] Trains on the line are at over 100% of capacity.[57] In June and July 2017, The New York Times found that during an average weekday, 10% to 15% of the trains scheduled to run through Grand Central–42nd Street were canceled. This meant that during peak periods, up to 13 trains per hour could be canceled, resulting in 1,000 passengers being displaced for every canceled train. Train frequencies were also erratic, with higher frequencies on some days than on others.[58]
On May 27, 2015, the New York City Council approved plans for a developer to build One Vanderbilt, a 65-story skyscraper. The MTA mandated that the developers pay for station improvements at Grand Central to allow for the building's construction.[59] In 2015, SL Green, the developer, gave $220 million toward the building's construction,[60] of which two-thirds of the money would be used for station redesign;[61] this marked the largest private investment to date to the New York City Subway system.[62] As part of the station construction, 40% of the basement of the Grand Hyatt New York would be destroyed in order to make room for the expansion of the subway mezzanine, as well as two new subway entrances in the One Vanderbilt building itself.[62] The new building would also coincide with the MTA's East Side Access project, and station improvements due to One Vanderbilt's construction would provide extra capacity for over 65,000 new passengers going into the New York City Subway at Grand Central–42nd Street.[63][64] The improvements include an underground connection between Grand Central Terminal and One Vanderbilt; new mezzanines and exits for the subway station; and three new stairways to each of the Lexington Avenue Line platforms.[62][65] This would directly result in additional capacity for the subway station, with 4,000 to 6,000 more subway passengers per hour being able to use the station, allowing for one additional express train per hour.[62] These improvements would cost over $200 million.[66][67]