Battle of the Ancre
The Battle of the Ancre (13–18 November 1916), was fought by the British Fifth Army (Lieutenant-General Hubert Gough), against the German 1st Army (General Fritz von Below). The Reserve Army had been renamed the Fifth Army on 30 October. The battle was the last of the big British attacks of the Battle of the Somme. After the Battle of Flers–Courcelette (15–22 September) the Anglo-French armies tried to press their advantage with smaller attacks in quick succession, rather than pausing to regroup and give the Germans time to recover. Subsequent writers gave discrete dates for the Anglo-French battles but there were considerable overlaps and continuities of operations until the weather and supply difficulties in mid-November ended the battle until the new-year.
Not to be confused with Battle of the Ancre Heights.The British attack was to fulfil complementary objectives. Political discontent in London would be muted by a big victory, as would doubts of British commitment by its allies and British loyalty to the Chantilly strategy of 1915 would be upheld. The capture of Beaumont Hamel and Serre would go some way to redeem the failure of 1 July and obtain ground on which the British would have a tactical advantage. The attack was the largest in the British sector since September and had a seven-day preliminary bombardment, which was twice as heavy as that of 1 July. The capture of Beaumont Hamel, St Pierre Divion and Beaucourt threatened the German hold on Serre further north. Edmund Blunden called the battle "a feat of arms vieing [sic] with any recorded. The enemy was surprised and beaten". Four German divisions had to be relieved due to the number of casualties they suffered and over 7,000 German troops were taken prisoner.
Background[edit]
Tactical developments[edit]
After meeting on 17 October between Lieutenant-General Sir Henry Rawlinson the Fourth Army commander and Gough, General Sir Douglas Haig, the commander of the British Expeditionary Force (BEF) cancelled the Third Army operation planned in September and on 23 October, the Reserve Army attack was reduced from a converging attack towards the Ancre river, to an attack up the valley. The failure of the Fourth Army attack of 18 October, caused another revision of the plan. The Reserve Army was to capture the rest of Thiepval Ridge with II Corps on 21 October, the Fourth and French Sixth armies were to attack on 23 October and the reduced Reserve Army attack on both sides of the Ancre was to begin on 25 October. Gough issued a new operation order on 15 October and began another reorganisation on the north side of the Ancre.[1] The II Corps operation on 21 October succeeded but the rains returned on 24 October. The main attack was postponed until 25 October and then cancelled; Gough was given discretion to continue with postponements by Haig. On 27 October, Gough set 1 November as the provisional date, postponed it again on 29 October to 5 November and on 3 November, Haig gave Gough the choice of cancelling the attack and resuming operations when the weather improved. On 5 November, Haig suggested a subsidiary attack, if the state of the ground justified the effort. Gough proposed an attack on 9 November but preferred to delay the main effort. Haig agreed that there should be no attack until the ground was dry enough for infantry to move freely and there was a forecast of two days of fair weather; another postponement followed.[1]
On 3 November, Major-General Rudolph Cavan the XIV Corps commander, wrote to Rawlinson, objecting to the renewal of attacks on Le Transloy, having already lost 5,320 casualties. Rawlinson informed Haig that he was going to limit the next attack, which led to a conference at Fourth Army headquarters on 4 November, attended by Haig and General Ferdinand Foch. Haig explained that the Fourth Army would be attacking at other points on 5 November and Cavan agreed to make certain that the French left flank was protected. On 6 November, Rawlinson announced that the Fifth Army operation due in the Ancre valley had been reduced and that the Fourth Army would conduct "modified operations", intended to stop the Germans moving troops from France. Apart from attacks near Saillisel, the French Sixth Army began to consolidate for the winter.[2] After another discussion on 8 November, at the Fifth Army headquarters by Lieutenant-General Launcelot Kiggell, Haig's Chief of the General Staff and Gough, a meeting between Gough and the corps commanders, decided that the attack should begin on 13 November, if the weather stayed dry. Opinion among divisional and brigade commanders varied on the possibility of an attack and that it should go ahead or be cancelled rather than be postponed again; patrols were sent out frequently to report on the state of the ground. On 10 November, Gough set the attack for 5:45 a.m. on 13 November. After studying the Fifth Army plans, Haig allowed the attack to go ahead and Gough later arranged with the corps commanders, that operations towards Pys and Irles would begin if the attack on 13 November went well but avoided detail, due to the uncertain weather.[3]
Prelude[edit]
British preparations[edit]
To be ready for the big attack intended for 12 October, Gough began to concentrate more troops in the area north of the Ancre. In early October the north bank was held by the 39th Division of V Corps up to the boundary with the Third Army at Hébuterne. On 1 October, the 2nd Division was moved in on the left of the 39th Division to hold the ground from Redan Ridge to the army boundary. On 4 October the XIII Corps headquarters was brought out of reserve, to control 1,500 yd (1,400 m) of the front line up to the junction with the Third Army and the 2nd Division was relieved on the left by the 51st Division.[4] The 39th Division was transferred to the command of II Corps on 2 October and then took over the area south of the Ancre on 5 October, by extending its right boundary to relieve the 18th Division at Thiepval. By 7 October XIII Corps had the 51st and 19th Divisions in line and on 8 October, V Corps relieved the 2nd Division with the 3rd and 63rd divisions. Gough issued instructions for the attack on the north bank from 4 to 12 October and arranged for the 1st and 3rd Cavalry divisions to move close to the front line. The artillery of V Corps and XIII Corps steadily bombarded the German defences on the south bank where II Corps operations against Staufen Riegel (Regina Trench to the Canadians at the east end and Stuff Trench to the British at the western end, north of Thiepval) and conducted a simulated offensive with artillery bombardments, wire-cutting and smoke screens.[5]
The British front line north of the Ancre had been moved forward across no-man's-land, until the average width was less than 250 yd (230 m). It was intended to isolate the battlefield with artillery and bombard Pys, Irles, Miraumont and Puisieux and the main trenches leading to the battlefield. On the II Corps front, artillery fire was to simulate an attack on the ground east of the old German second line (Grandcourt line) as would XIII Corps artillery on the German approaches to the northern flank.[6][a] Slow progress on the south bank by II Corps, attempting to occupy Regina Trench, caused by a serious deterioration in the weather and determined defence by the Germans of the remainder of their positions on the ridge north of Courcelette and Thiepval, caused numerous postponements of the general attack on both sides of the Ancre. Haig's plans of late September were reduced to achieving as much as could be done in periods of better weather. Conditions on the battlefield by mid-October, were "so bad as to make mere existence a severe trial of body and spirit".[8] On 12 November, Beaumont Hamel was subjected to a gas bombardment, similar to one on 28 October, when "sk" (lachrymatory) mortar bombs were fired into the village at midday, to wear out the German garrison's respirators and then in the evening Phosgene was fired by Livens Projector to kill them.[9]
British plan[edit]
Gough planned to attack on 13 November, with five divisions from II and V Corps astride the Ancre river, which flowed between Thiepval and Beaumont Hamel.[b] Gough intended to reduce the head of the German salient between Thiepval and Serre, the main effort coming from V Corps with the 63rd, 51st, 2nd and 3rd divisions, against positions north of the Ancre, which had not been seriously attacked since 1 July. It was hoped that the intervening nineteen weeks of trench warfare, had substantially reduced German fighting power.[11] Three objective lines were set, the first running from Beaucourt Station (opposite St Pierre Divion)–up Beaumont Hamel valley–eastern outskirts of Beaumont Hamel–Redan Ridge–west of Serre, requiring an advance of 800 yd (730 m) over three German trench lines and four trench lines in places. The second line was 600–1,000 yd (550–910 m) further forward, running west of Beaucourt–east slope of Redan Ridge–east of Serre–west to the boundary of V and XIII Corps, which would be advanced towards Star Wood. The final objective (third line) was set at Beaucourt–the Puisieux road valley–second line. II Corps with the 4th Canadian, 18th, 19th and 39th divisions was to advance from Stuff trench and Schwaben Redoubt to the Hansa line to force the Germans out of their defences, from Schwaben Redoubt–St Pierre Divion, as far back as Beaucourt, securing the road bridges by Beaucourt station and Beaucourt mill by 7:25 a.m.[12]
The V Corps bombardment was intended to create tactical surprise, by the heavy artillery firing on the German front line thirty minutes before dawn each morning, for an hour of intense fire joined by the field artillery. It was hoped that the German garrisons would become accustomed to the routine and not react, when the opening bombardment for the attack began at 5:45 a.m. No man's land 50 yd (46 m) back from the front trench was to be bombarded by 25 percent of the 18-pounders, to cover the infantry as it advanced from the British line. After six minutes the bombardment would creep forward at 100 yd (91 m) in five minutes, pausing on the reserve line of the German front trench system before moving on. The infantry had 56 minutes to reach the first objective and then move on after a pause of an hour. After five minutes of silence a lifting bombardment, beginning with intense fire, would signal the infantry to begin their advance. The attack by the 63rd Division on Beaucourt was to begin 200 minutes after zero, preceded by a bombardment from all available artillery.[12] A few tanks were available and the bombardment was twice the weight of that before 1 July. A machine-gun barrage (first tried at the Battle of Thiepval Ridge, 26–30 September) was to be laid on the German machine-guns dug in along the ridge behind Beaumont Hamel.[13]
Air reconnaissance reports late in the afternoon of 17 November, indicated that the Germans had abandoned Puisieux Trench and the Grandcourt line south of the river. Gough ordered both corps commanders to send patrols and occupy the trenches if possible. New orders were issued, extending the objectives for the attack planned for 18 November. The new plan for 18 November allowed II Corps a halt of 90 minutes on the first objective and the 19th Division would then attack Grandcourt and Baillescourt Farm. The 4th Canadian and 18th divisions would then advance and take Grandcourt Trench to link with the 19th Division at the east end of Grandcourt. II Corps was then to cross the Ancre to take Baillescourt Farm. V Corps was to synchronise its advance to Pusieux Trench and River Trench up to Artillery Alley on the north bank of the Ancre. Lieutenant-General Claud Jacob the II Corps commander protested against the plan and was over-ruled, despite patrols from the 19th Division finding Germans repairing the wire of the Grandcourt line.[14]